Removal of 2nd floor formwork with concrete staircase

Tomorrow is the removal of 2nd floor formwork. I am so excited. The 2nd floor concrete slab will be ready together with a RC staircase to the 3rd storey. Once the formworks have been removed, we can move in the 1st floor steel 'fishbone' staircase and start constructing the 3rd storey!